Pool Packages

Pick your package, know your price, and enjoy your new pool in just 6 weeks. Exclusive for SCV residents.

29425098_1667944076576715_8995036491474272256_n.jpg

Minimum Requirements

  • Pool area must be relatively flat with minimal demolition required.

​

  • Cannot be on a slope or hillside.

​

  • Minimum of 4' access required for excavation.

​

  • Pool equipment location relative to the pool cannot exceed 100 feet.

​

  • Gas and electrical meter in relation to the pool equipment cannot exceed 100 feet.

Add-On's

  • Ozone UV System - $x,xxx

​

  • Pool Heater - $6,000

​

  • Pool Chiller & Heater - $9,500

​

  • 6 Therapeutic Jets - $4,500

​

  • Child Safety Fence - $7,000​

​

  • Saltwater System - $0

​

  • Umbrella Sleeve - $0

Additional Information

HOA/City Plans & Engineering Fees – Not included. These fees are paid directly to the city by the homeowner. Soils Report – $4,500 (only if required by the city). Construction Timeline – 6-week build time begins once permits are received. Possible Delays – Weather, inspections, change orders, third-party factors, or payment delays may extend the construction timeline. Equipment & Automation – Premium pool equipment and automation by Hayward. Finish – Mini pebble by Stonescapes. Tile – Outdoor-rated, anti-slip porcelain tile. Custom Options – Stairs and benches are fully customizable.