Pool Packages
Pick your package, know your price, and enjoy your new pool in just 6 weeks. Exclusive for SCV residents.

Minimum Requirements
-
Pool area must be relatively flat with minimal demolition required.
​
-
Cannot be on a slope or hillside.
​
-
Minimum of 4' access required for excavation.
​
-
Pool equipment location relative to the pool cannot exceed 100 feet.
​
-
Gas and electrical meter in relation to the pool equipment cannot exceed 100 feet.
Add-On's
-
Ozone UV System - $x,xxx
​
-
Pool Heater - $6,000
​
-
Pool Chiller & Heater - $9,500
​
-
6 Therapeutic Jets - $4,500
​
-
Child Safety Fence - $7,000​
​
-
Saltwater System - $0
​
-
Umbrella Sleeve - $0
Additional Information
HOA/City Plans & Engineering Fees – Not included. These fees are paid directly to the city by the homeowner. Soils Report – $4,500 (only if required by the city). Construction Timeline – 6-week build time begins once permits are received. Possible Delays – Weather, inspections, change orders, third-party factors, or payment delays may extend the construction timeline. Equipment & Automation – Premium pool equipment and automation by Hayward. Finish – Mini pebble by Stonescapes. Tile – Outdoor-rated, anti-slip porcelain tile. Custom Options – Stairs and benches are fully customizable.

